In Weilheim an der Teck, at the foot of the Swabian Jura, Josef Rädlinger Ingenieurbau GmbH's network construction division has carried out two electricity projects on behalf of Netze BW in March and April.

The order was received in late February and included the wiring of parts of an industrial area and a low-voltage overhead line need of renewal, including the service connections in the residential area concerned.

In total, network construction teams created about 600 metres of route for the main power supply and almost 20 service connections. In addition, cable-conduit-protection systems and cable distribution cabinets were installed at the same time. In parallel with construction of the power lines, the network construction team also carried out repair work in the town's streets.

After the cables were installed, the power connections of the customers were linked to the mains and the surface works in the area of the lines completed on time, and the roads opened to traffic.


Corporate Video

 

News-Archiv

19.08.2008 Traffic approval of the B63 Duernbach / Schachendorf by-pass

Construction site opened and approved for traffic[more]



30.10.2014 Painting project and info point for the north bypass around Darmsheim

In October Johannes Schmalzl, District President of the Stuttgart district, visited the site for the north bypass around Darmsheim and opened an info point. Since...[more]



01.08.2011 14 trainees started the new training year

On 1 August 2011, a total of 14 young people began their training in nine different occupations in the head office of the Rädlinger Group in Cham. Eight young people...[more]