Rädlinger Stahlbau builds warehouse for pallet manufacturer

During the summer months, Rädlinger Stahlbau built a new warehouse, covering an area of over 1,900 square metres, for pallet manufacturer Bössl in Schönthal. It took over the detailed planning and construction planning, and the manufacture, delivery and installation of the modules. The photovoltaic system on the ridged roof was designed and installed by RWenergy, the separate electrical engineering division. The flooring was in the form of a semi-rigid outer layer, and was installed by our asphalt department. The result is a modern building with a canopy, which marries logistics functionality and energy-related requirements. A total of 82 tonnes of hot-dip galvanized steel were used for the supporting structure. The ridged roof with a 12-degree slope is interrupted by a curved band of light, 50 metres in length.


Corporate Video

 

News-Archiv

25.01.2016 Six lanes for the A6 near Nuremberg

The approx. 6km-long stretch between the Nürnberg-Süd and Roth junctions on the A6 is a real bottleneck. On average, 78,000 vehicles currently travel along the motorway,...[more]



04.07.2016 Network construction expands range of services

The network construction department at Josef Rädlinger Ingenieurbau GmbH has extended its range of services by two new fields. After the order situation for the...[more]



09.12.2013 Christmas tree adorns St Peter's Square

The Rädlinger low-loader trailer with the Christmas tree arrived in Rome earlier than expected. With the best wishes of Waldmünchen residents and the blessing of Bishop...[more]