Rädlinger invests in location Selbitz

A modern, sustainable office building is established in the subsidiary of Rädlinger Bauunternehmen in Selbitz. Josef Rädlinger laid the foundation stone for this in October, together with his wife, Petra, the architects, the structural engineer and representatives of the city of Selbitz and the Nuremberg Highway Authority. "The new building represents the future.", said Josef Rädlinger during the laying of the foundation stone, and thus underscored the roots with the location of Selbitz and the region.

In the planning for the new 32x32-metre office complex, sustainability of the building played a large role, which is why attention was paid to the use of natural raw materials and low energy consumption of the building. In addition, the building also meets demands for a modern workplace. Following completion in summer 2013, natural light and short distances are to create good working conditions.

In addition to the office building, the entire yard will be redesigned on an area of 35 000 m², and the existing petrol station will be rebuilt.

 


Corporate Video

 

News-Archiv

06.12.2012 Noise barriers on the A8 - creative integration into the environment

70,000 vehicles move daily through the section of the A8 between Gruibingen and Mühlhausen at only a short distance from the residential areas. For this reason, noise...[more]



04.08.2015 Flood protection initiated in Reinhausen

“The beautiful has been combined with the useful”, said the Minister of State for Environment and Consumer Protection, Ulrike Scharf, at the initiation of the flood...[more]



17.06.2014 Charity run at Rädlinger Lake nominated as Initiative of the Month

On 10th August 2013, the Rädlinger Lake is to provide the setting for a run for a good cause. The charity run in aid of Kinderkrebshilfe Cham (a charity supporting...[more]