Network construction with a new look

With the official handover of the new construction site and utility vehicle, network construction presents itself with a modified design. The team’s motto “Our clients have plans and objectives – we connect them!” can now be read on one of the vehicles. Senior site managers Andreas Schönberger and Josef Mückl thanked the Managing Director and company owner Josef Rädlinger for the new vehicle, which is to take employees and their equipment to the construction site or the place of deployment quickly. The van will first be used in the context of the annual construction contract with REWAG in Regensburg. The network construction tasks there include fault clearance, the creation of house connections and pipe construction.

Soon all the vehicles of the department founded in 2013 are to have the new look and thus increase the recognition effect. The network connection services include, amongst other things, the underground installation of cables and pipes, pipe construction, the laying of cables and empty conduits, and cable assembly.


Corporate Video

 

News-Archiv

11.12.2014 A93 Pfreimd: asphalting across all carriageways

Rädlinger's Selbitz branch had less than two months between May and July to knock the 4500-metre-long section of the A93 motorway between Regensburg and Weiden at...[more]



02.07.2012 Construction begins on the new B15new trunk road site

At the beginning of July, the starting shot was given for continuation of the major B15new trunk road construction site between Neufahrn and Ergoldsbach. The contract...[more]



25.07.2014 Completion of the bypass of the M3 and B 471 at the A 99 junction Aschheim/Ismaning

In order to cope with traffic load on the A 99 motorway ring around Munich even during relocation of the Aschheim/Ismaning junction, a provisional bypass of the M3 and B...[more]