Network construction with a new look

With the official handover of the new construction site and utility vehicle, network construction presents itself with a modified design. The team’s motto “Our clients have plans and objectives – we connect them!” can now be read on one of the vehicles. Senior site managers Andreas Schönberger and Josef Mückl thanked the Managing Director and company owner Josef Rädlinger for the new vehicle, which is to take employees and their equipment to the construction site or the place of deployment quickly. The van will first be used in the context of the annual construction contract with REWAG in Regensburg. The network construction tasks there include fault clearance, the creation of house connections and pipe construction.

Soon all the vehicles of the department founded in 2013 are to have the new look and thus increase the recognition effect. The network connection services include, amongst other things, the underground installation of cables and pipes, pipe construction, the laying of cables and empty conduits, and cable assembly.


Corporate Video

 

News-Archiv

09.10.2012 Series of tests at building project B 174, Gornau Chemnitz

Recently abroad, increasing demands on quality control in road construction, as well as the development of new technologies has led to the development of three new rapid...[more]



27.10.2014 10 kV voltage line built on the ascent to the Swabian Alb

On behalf of NETZE-BW (an EnBW company), the network construction department of Josef Rädlinger Ingenieurbau GmbH accepted the order to build a voltage line (10 kV cable...[more]



29.07.2014 Ground-breaking ceremony for new flood protection in Windorf

On 10 July 2014, residents, representatives of the local authorities, construction specialists and politicians – including the Bavarian Environment Minister Marcel Huber...[more]