Canal construction seal of quality for Leipzig branch

Being awarded the seal of quality of the AK 2 assessment group means that the Leipzig branch of Rädlinger Bauunternehmen meets all the requirements set out in the canal construction quality assurance standards RAL-GZ 961. The award requires companies to have sufficient experience and reliability, the building site to be equipped with a sufficient quantity of staff and functional equipment, and occupational safety guidelines to be observed. The seal of quality was awarded by the Quality Control Organisation for the Construction and Maintenance of Sewage Channels and Canals.


Corporate Video

 

News-Archiv

28.01.2016 High standards with old methods on the A9

The A9 – a motorway, which connects the two cities with more than a million people, Berlin and Munich, and which has six lanes virtually along its complete stretch. When...[more]



07.11.2012 Rathsmannsdorf industrial park

"Windfall for the region, black day for Vilshofen", was the headline in an article in the newspaper Passauer Neue Presse on 3 December 2011. But what does all...[more]



25.07.2014 Completion of the bypass of the M3 and B 471 at the A 99 junction Aschheim/Ismaning

In order to cope with traffic load on the A 99 motorway ring around Munich even during relocation of the Aschheim/Ismaning junction, a provisional bypass of the M3 and B...[more]