Canal construction seal of quality for Leipzig branch

Being awarded the seal of quality of the AK 2 assessment group means that the Leipzig branch of Rädlinger Bauunternehmen meets all the requirements set out in the canal construction quality assurance standards RAL-GZ 961. The award requires companies to have sufficient experience and reliability, the building site to be equipped with a sufficient quantity of staff and functional equipment, and occupational safety guidelines to be observed. The seal of quality was awarded by the Quality Control Organisation for the Construction and Maintenance of Sewage Channels and Canals.


Corporate Video

 

News-Archiv

26.01.2016 Battling against blow ups on the A3

Heat damage made the concrete carriageway on the motorway section between the Bayerischer Wald rest and service area and the Bogen junction a tough job. At the end of...[more]



20.12.2013 Noise protection walls along the new B174 between Gornau und Chemnitz

As part of the construction of the new B174 by the Leipzig branch, Rädlinger Ingenieurbau built ten noise protection walls with a total length of approximately 3,850 m...[more]



14.10.2009 Pilot project PPA model on the A71

Together with the joint venture partners Bögl GmbH & Co. KG and HTI Greussen GmbH (bridge construction), the Rädlinger construction company has been carrying out a...[more]